Design and Construction Report (2020)
- Design and Construction Report
- Appendix A – Detail Design Consultation Materials
- Appendix B – Recommended Design Drawings
Transportation Environmental Study Report (2017)
- Highway 400 Improvements – Highway 89 to Highway 11 TESR Addendum_November2017
- Appendix A – Changes to the Approved Plan outlined in the 2004 TESR (G.W.P. 30-95-00)
- Appendix B – Environmental Assessment Conditions of Approval Letter
- Appendix C – Highway 400 Widening and Interchange Evaluation Summary Tables
- Appendix D – Relevant Correspondence
- Appendix E – Copies of PIC Displays
- Appendix F – Landscape Opportunities Plan